XCMG Global Circularity Business Center

XCMG Global Circularity Business Center

How to speed up the removal of stubborn stains?

2025 09/04

 

Industry Pain Points and Your Troubles

In heavy industrial settings, traditional floor scrubbers face a 67% decline in cleaning efficiency when dealing with the oil and dirt mixture on the floors of XCMG Construction Machinery workshops. Even more challenging is the hardened residue left by Concrete Truck Mixers in concrete mixing plants, which causes the service life of the brushes on 89% of the equipment on the market to be less than 200 hours. Are you also suffering from an average of 2.3 manual re-cleaning sessions per day and annual maintenance costs as high as 18% of the equipment's value? 

Our innovation solution

The third-generation magnetic levitation floor scrubbing system, specially developed for industrial harsh environments, adopts 360° high-pressure rotary jet technology. When dealing with the hardened slurry around the base of Concrete Mixer Machines, the 28MPa targeted water jet can remove 5cm thick concrete stains in 3 minutes. Equipped with tungsten steel reel brush bristles, the overall durability of the equipment is enhanced to 12,000 hours, making it perfectly suitable for extreme working conditions such as mining and casting. 

Actual performance verification 

Data from the National Construction Machinery Quality Inspection Center:
  •  Epoxy floor cleaning efficiency reaches 98 square meters per minute (GB 38537 standard)
  •  Oil-water separation rate is 99.7% (exceeding ISO 16336 requirements)
  • Slope operation stability up to 35° inclination

Product features 

Self-sensing adjustment: The turbidity sensor automatically matches the cleaning intensity.
Modular design: Quick-change brush heads can be replaced in just 90 seconds.
Energy closed loop: The wastewater recycling purification rate reaches 80%.

Usage tips:

① Pre-spray emulsifier before treating Concrete Truck Mixer residue.
② Check the wear index of the scraper weekly (threshold 1.5mm).
③ Enable the anti-freezing circulation mode when operating in the freezer. 
This industrial beast is like a mobile purification station. The combination of its titanium alloy frame and military-grade waterproof circuitry enables it to demonstrate extraordinary combat effectiveness in the XCMG Construction Machinery maintenance workshop. Tests conducted by a certain cement group show that: 
The cleaning time for a 5,000㎡ mixing plant has been compressed from 8 hours to 110 minutes. The frequency of brush replacement has been extended from once every 3 days to once every 45 days. The annual comprehensive operation and maintenance cost has decreased by 640,000 yuan. When technological innovation breaks through physical limits, the base of the Concrete Mixer Machine is no longer a blind spot for cleaning, but a touchstone for testing equipment performance. From the scorching hot shavings in steel mills to the GMP workshops in biopharmaceutical factories, our solutions are redefining the standards of industrial cleaning.Industrial floor scrubberRide-on floor sweeper